8.4 Retrofit Opportunities and Existing Infrastructure

Look for usable assets, not only vacant land

  • Existing tanks and buildings
  • Sewer connection and capacity
  • Dewatering equipment
  • Electrical service
  • Truck access
  • Odor-control retrofit needs
  • Environmental/site liabilities

Existing wastewater assets can change the capital equation

Decommissioned industrial pretreatment plants, municipal wastewater structures, unused tanks, former treatment buildings, or sites with existing sewer capacity can be candidates for retrofit. Existing assets may provide tankage, buildings, electrical service, roads, drainage, sewer connections, dewatering equipment, or permits that would be expensive to recreate.

Low purchase price does not automatically equal low project cost. Due diligence must evaluate structural condition, environmental liabilities, hazardous building materials, buried piping, equipment condition, utility capacity, title/easements, permit status, zoning, corrosion, code compliance, demolition, and the cost of adapting old assets to the new process.

  1. Inventory usable assets.
  2. Inspect structural/mechanical/electrical condition.
  3. Investigate environmental/site history.
  4. Confirm legal use and sewer capacity.
  5. Develop retrofit process flow.
  6. Price rehabilitation plus contingency.
  7. Compare lifecycle cost with greenfield alternatives.

Design and operating review

  • Perform structural assessment of tanks/buildings.
  • Camera/pressure-test buried piping where appropriate.
  • Review historical hazardous-material use and environmental records.
  • Inventory electrical capacity and obsolete controls.
  • Check whether existing equipment has parts/support.
  • Include demolition and unknown-condition contingency.
Failure mode to avoid

Failure mode: an old facility is purchased for a fraction of replacement cost, but corroded tanks, obsolete electrical gear, and environmental cleanup exceed the cost of a better site.

Technical video segment

Use this focused clip to reinforce the process described above.

Embedded Technical Video

Retrofit Opportunities and Existing Infrastructure

Segment 49:30–50:52. The written course contains all required learning content.