8.3 Facility Siting and Route Productivity

A disposal facility can change truck productivity

Application

Map service-call density, current disposal destinations, travel time by time of day, shop location, and candidate facility sites. Quantify truck-hours recovered by each candidate location.

The best site can create value every time a truck unloads

Facility location affects collection productivity just as strongly as tipping price. A disposal point at the edge of the service territory forces loaded trucks away from future jobs or away from the shop at the end of the route. A strategically located site can shorten deadhead travel and create more available hours for customer work.

Site analysis should use actual dispatch history rather than a simple map center. Plot customer density, truck routes, time-of-day traffic, shop location, highway access, current disposal sites, candidate sites, and unloading frequency. Measure travel in truck-hours and loaded miles, not just straight-line distance.

  • Weighted center of service calls
  • Travel time by time of day
  • Access from major routes
  • Loaded-truck restrictions
  • Distance to shop
  • Sewer/utilities at site
  • Neighbor sensitivity
  • Third-party hauler accessibility
  • Queue/stacking area

Design and operating review

  • Use historical GPS/dispatch data to model candidate locations.
  • Measure loaded truck-hours and empty truck-hours separately.
  • Consider traffic patterns, not only miles.
  • Evaluate queue capacity for company and third-party trucks.
  • Include truck wash, maintenance, and shop relationship.
  • Check whether site access creates neighborhood or road-weight conflicts.
Failure mode to avoid

Failure mode: a site is cheap and centrally located on a map but requires trucks to cross a congested downtown bridge during peak hours. Time-based analysis would have exposed the operational penalty.

Technical video segment

Use this focused clip to reinforce the process described above.

Embedded Technical Video

Facility Siting and Route Productivity

Segment 47:44–49:30. The written course contains all required learning content.